Break-In Procedures - HYOSUNG TE 450 Service Manual

Hide thumbs Also See for TE 450:
Table of Contents

Advertisement

GENERAL INFORMATION 1-6

BREAK-IN PROCEDURES

During manufacture only the best possible materials are used and all machined parts are finished to a very high
standard but it is still necessary to allow the moving parts to "BREAK-IN" before subjecting the engine to maximum
stresses.
The future performance and reliability of the engine depends on the care and restraint exercised during its
early life.
The general rules are as follows :
● Keep to these break-in procedures :
BREAK-IN ENGINE SPEEDS
Initial 10 hours
Less than 1/2 throttle
● After the engine has been operated for 10 hours the engine to full throttle operation, for short periods of time.
● Do not maintain constant engine speed for an extended period during any portion of the break-in.
Try to vary the throttle position.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents