Subaru IMPREZA 2002 Service Manual page 492

Hide thumbs Also See for IMPREZA 2002:
Table of Contents

Advertisement

PIPE ASSEMBLY
POWER ASSISTED SYSTEM (POWER STEERING)
3) Temporarily connect the pipes C and D to the
pipes (on the gearbox side).
I
S4M0430A
5) Tighten the clamp E firmly.
Tightening torque:
6) Tighten the joint nut.
Tightening torque:
7) Connect the pipes A and B to the four pipe joints
of gearbox. Connect the upper pipe B first, and low-
er pipe A second.
Tightening torque:
7.4 N-m (0.75 kgf-m, 5.4 ft-lb)
15 N.m (1.5 kgf-m, 10.8 ft-lb)
13 N-m (1.3 kgf-m, 9.4 ft-lb)
(1) Return hose
(2) Pressure
hose
(3) Approx. 30 mm (1.18 in)
(4) Clamp E
(5) Pipe C
(6) Pipe
D
(7) Pipe
(on gearbox side)
4) Temporarily install the clamp
E on the pipes C
and D.
CAUTION:
Ensure that the letter "8" on each clamp are di-
agonally opposite each other as shown in fig-
ure.
(1) Pipe A
(2) Pipe B
8) Install the jack-up plate.
9) Install the air intake duct. (Non-TURBO model).
<Ref. to IN(S0HC)-7, INSTALLATION, Air Intake
Duct.>
10) Install the air intake duct, air intake boot and air
cleaner upper cover. (TURBO model)
<Ref. to IN(D0HC TURBO)-7, INSTALLATION, Air
Cleaner.> and <Ref. to IN(D0HC TURBO)-8, IN-
STALLATION, Air Intake Duct.>
11) Connect the battery ground terminal.
I
I
(1) Clamp E
(2) Pipe C
PS-50

Advertisement

Table of Contents
loading

Table of Contents