Subaru IMPREZA 2002 Service Manual page 151

Hide thumbs Also See for IMPREZA 2002:
Table of Contents

Advertisement

FRONT DRIVE SHAFT
DRIVE SHAFT SYSTEM
7) Install the boot projecting portion to shaft groove.
D: ASSEMBLY
CAUTION:
Use specified grease.
EBJ side:
SFJ side:
1) Place the EBJ boot and small boot band on the
BJ side of shaft.
CAUTION:
Be sure to wrap shaft splines with vinyl tape to
prevent boot from scratches.
2) Place the drive shaft in a vise.
CAUTION:
Do not place drive shaft directly in the vise; use
wooden blocks.
3) Apply a coat of specified grease [60 to 70 g (2.12
to 2.47 oz)] to EBJ.
4) Apply an even coat of specified grease [20 to 30
g (0.71 to 1.06 oz)]
to
the entire inner surface of
boot. Also apply the grease to the shaft.
NOTE:
The inside of the larger end of BJ boot and the boot
qroove shall be cleaned so as to be free from
NTG2218 (Part No. 28093AA000)
SSG6003 (Part No. 28093TAOOO)
irease and other substances.
5) Install the boot projecting portion to the
groove.
EBJ
(A) EBJ
(6)
Lorge
boot band
(C)
Boot
6) Set the large boot band in place.
, C )
N
B4M
1297C
(A) Boot
(6) Small boot band
(C) Shaft
DS-35

Advertisement

Table of Contents
loading

Table of Contents