1126800
3. Plug the connector end of the cable into the operator station.
4. At the other end of the cable, connect the wires to the control enclosure main connector
terminals, as shown in Table A at the end of the manual and wiring diagram Figure 2 at
the end of this manual. For a dual operator station installation, see wiring diagram Figure
2 at the end of this manual.
Place the operator station in a temporary location, on the floor or on a cart. Then wire the
operator station to the control enclosure and continue with all other installation, checkout
steps, and operation procedures in Chapters 2 and 3. After you find the proper safety
distance ("Calculating the Safety Distance," page 348), you can permanently mount the
operator station at that distance.
4.69
(119.1)
5.8
(148)
REF
Figure 2 - 9. Operator Station, Side Buttons
Page 48
21.25
(539.8)
EMERGENCY
PRIOR
PALM
R
ACT
TIME
U
N
/
I
N
C
H
Chapter 2
SmartPAC 2 with WPC Integration
16.75
(425.5)
TOP
MUTE
STOP
STOP
RESET
Installing SmartPAC 2 and WPC
R
U
5.50
N
/
I
(139.7)
N
C
H
Dimensions:
inches
(mm)