Part 6 - Set Up Smartpac2 With Wpc - Honeywell SmartPAC 2 User Manual

Press automation control with wintriss wpc clutch/brake control
Table of Contents

Advertisement

SmartPAC 2 with WPC Integration
Part 6 – Set Up SmartPAC2 with WPC
DANGER
!
INJURY DURING SETUP OR TESTING
Keep all personnel away from the press during setup and testing.
Ensure that there is no die or other tooling in the press during setup and testing.
Failure to comply with these instructions will result in death or serious injury.
CAUTION
DAMAGE TO PRESS AND/OR DIE
Ensure that no die is mounted in the press during test and setup procedures.
Failure to comply with these instructions could result in property damage.
Turn On Power to SmartPAC 2 and WPC, next page
Problems at Startup, page 98
Verify Proper Installation of ProCamPAC and/or DiProPAC Options, page 100
Initialize WPC Press Parameters, page 101
Create and Load a Test Tool Number, page 103
Check and Set Direction of Resolver Rotation, page 104
Zero the Resolver, page 105
Set Top Stop Angle and Install Overrun Magnet, page 107
Prepare to Install Magnet for Overrun Limit Sensor, page 116
Install Magnet for Overrun Sensor, page 125
Check the ON and OFF Time of the Overrun Sensor, page 126
Installing SmartPAC 2 and WPC
Chapter 2
1126800
page 95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents