Honeywell SmartPAC 2 User Manual page 15

Press automation control with wintriss wpc clutch/brake control
Table of Contents

Advertisement

SmartPAC 2 with WPC Integration
1126800
List of Figures and Tables
Figure 1 - 1 SmartPAC 2 Front Panel...................................................................................................................4
Figure 1 - 2. Illustration of Operator Station .........................................................................................................6
Figure 1 - 3. How SmartPAC 2 Interprets Signals From a "Green" Sensor .......................................................14
Figure 1 - 4. How SmartPAC 2 Interprets Signals From a Sensor Set to "Green Quick Check" ........................15
Figure 1 - 5. How SmartPAC 2 Interprets Signals From a Sensor Set to "Green Constant" ...............................16
Figure 2 - 1. Installation Overview......................................................................................................................29
Figure 2 - 2. Attaching Wires to Connector.........................................................................................................31
Figure 2 - 3. Connecting Shield Drain Wire to Ground Stud ..............................................................................31
Figure 2 - 4. WPC Mounting Dimensions ...........................................................................................................33
Figure 2 - 5. Mounting dimensions for Non-enclosure WPC..............................................................................34
Figure 2 - 6. Setting Voltage Selector Switch .....................................................................................................36
Figure 2 - 7. Resolver ..........................................................................................................................................42
Figure 2 - 8. Overrun Sensor Magnetic Switch Installation Example ..................................................................44
Figure 2 - 9. Operator Station, Side Buttons........................................................................................................48
Figure 2 - 10. Operator Station, Top Buttons ......................................................................................................49
Table 2 - 1. User Inputs (Interlocks), SmartPAC with WPC...............................................................................54
Figure 2 - 11. One Way to Wire WPC Operator Mode Outputs..........................................................................56
Figure 2 - 12. One-hand Control Switch Dimensions..........................................................................................59
Figure 2 - 13. One-hand Control Switch Base, Showing Mounting Holes..........................................................60
Figure 2 - 14. Wiring Connections in One-hand Control Switch ........................................................................60
Figure 2 - 15. Multiple Operator Station Configurations ....................................................................................63
Figure 2 - 16. Installing the LMCS and Magnets ................................................................................................67
Figure 2 - 17. Bar Control Enclosure Mounting Dimensions ..............................................................................68
Figure 2 - 18. SmartPAC 2 Mounting Dimensions, Enclosure............................................................................71
Figure 2 - 19. SmartPAC 2 Mounting and Cutout Dimensions, Panel Mount.....................................................73
Table 2 - 2. Resolver Wiring on SmartPAC 2 .....................................................................................................75
Figure 2 - 20. Wiring AC to SmartPAC 2, Top Right Inside Enclosure..............................................................76
Figure 2 - 22. Input check switch (S101) ............................................................................................................78
Table 2 - 3. Wiring to Input Check and Stop Circuits .........................................................................................78
Figure 2 - 23. ProCamPAC Output Assembly.....................................................................................................85
Figure 2 - 24. Cam Outputs Board ......................................................................................................................86
Table 2 - 4. ProCamPAC to Cam Output Assembly TB301, Cams 1-8 ..............................................................87
Table 2 - 5. ProCamPAC to Cam Output Assembly TB301, Cams 9-16 ............................................................87
Table 2 - 6. Making Connections to Relays.........................................................................................................88
Figure 2 - 25. Connector TB302 and TB303 for Wiring Relays to Equipment...................................................88
Figure 2 - 26. How to Connect Suppressors Across the Load .............................................................................89
Table 2 - 7. SmartPAC 2 to DSI 2 DiPro Sensor Interface, Sensors 1-8 .............................................................91
Table 2 - 8. SmartPAC 2 to DSI 2 DiPro Sensor Interface, Sensors 9-16 ...........................................................91
Figure 2 - 27. DiPro Remote Connection Box for Sensors..................................................................................92
Table 2 - 9. DiPro RCB to SmartPAC 2 ..............................................................................................................93
Table 2 - 10. DiPro RCB to SmartPAC 2 (continued).........................................................................................93
Figure 2 - 28. SmartPAC 2 Startup Screen..........................................................................................................96
Figure 2 - 29. Main Program Menu .....................................................................................................................97
Figure 2 - 30. SmartPAC 2 Main Initialization Menu .........................................................................................97
Figure 2 - 31. List of Installed Options..............................................................................................................100
Figure 2 - 32. WPC Initialization Menu ............................................................................................................102
Figure 2 - 33. "Press Parameters" Display in SmartPAC's Initialization Mode.................................................102
Figure 2 - 34. Initialize Parameters Warning Message......................................................................................102
Figure 2 - 35. "Resolver Zero" Screen ..............................................................................................................106
Table 2 - 11. Top Stop Angle 240 ° or less: Mounting Overrun Magnet ..........................................................117
Table 2 - 12. Top Stop Angle bet. 241 ° and 270 ° : Mounting Overrun Magnet................................................119
Table 2 - 13. Top Stop Angle bet. 271 ° and 300 ° : Mounting Overrun Magnet.................................................121
Table 2 - 14. Top Stop Angle 301 ° or Greater: Mounting Overrun Magnet ....................................................123
Figure 2 - 36. Installing Magnet for Overrun Sensor.........................................................................................125
Table of Contents
page xi

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents