Table B - 1. Preventive Maintenance Items - Honeywell SmartPAC 2 User Manual

Press automation control with wintriss wpc clutch/brake control
Table of Contents

Advertisement

SmartPAC 2 with WPC Integration

Table B - 1. Preventive Maintenance Items

air rotary seals
counterbalance system
flywheel bearing
pitman bearing (1 through 4)
1
run hours
weeks
die changes
F## WPC press control faults (#: 45 - 59)
1 For SmartPAC (without WPC), "run hours" refers to the length of time that SmartPAC is "on." For SmartPAC
with WPC, it means how long the motor is "on." (The version of SmartPAC that you currently have is without
WPC. Contact Wintriss Tech Support if you require WPC.)
2 Ch. cycles 1 through 16 can be used only if you have a 16-channel ProCamPAC. Only ch. cycles 1 through 8
can be used for an 8-channel configuration.
3 These are only available if you have SmartPAC with WPC and if you have wired and assigned press functions
to the user-definable inputs. (The version of SmartPAC that you currently have is without WPC. Contact
Wintriss Tech Support if you require WPC.)
4 "Press overload" is only available with AutoSetPAC option.
SmartPAC Preventive Maintenance
(PM) Monitor
brake
clutch valve
DSV
lube filter
lube system
main motor
pilot solenoid
Table B - 2. PM Tracking Units
3
Appendix B
back shaft bearing (1 through 4)
bull gear
conveyor (1 through 6)
drive belts
feeder
gibs
lube motor
main bearing (1 through 4)
oil level
pinion key
"Custom" name
days
months
ch. cycles (1 through 16)
4
press overloads
1126800
2
page 439

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents