Tools and Equipment Needed

To install the system, you need the following tools:
No. 2 Phillips screwdriver
ESD mat and grounding strap
Pencil, stylus, or other pointed device, for pushing front panel buttons
You also need a system console device, such as one of the following:
Sun workstation
ASCII terminal
Terminal server
Patch panel connected to a terminal server

Tasks

ZS3-2 Controllers Tasks
Installing the Mounting Brackets and Slide Rail Assemblies
If the mounting brackets are shipped inside the slide rails, you must remove them before
beginning this procedure, as follows.
Unpack the slide rails and locate the slide rail lock at the front of the assembly.
1
Squeeze and hold the tabs at top and bottom of the lock (1) while you pull the mounting bracket
2
out to the stop.