Verify The Front Status Leds; Figure 58 Pilot Bezel Leds - Oracle Pillar Axiom 600 Hardware Installation Manual

Oracle pillar axiom 600 hardware installation guide
Table of Contents

Advertisement

Chapter 6 Complete the Installation

Verify the Front Status LEDs

You can verify the installation of the hardware by checking the LEDs on the Pilot,
Slammer, and Brick bezels.
1 Verify the Pilot CU LEDs are steady green and not blinking.
If the LEDs are off, ensure that the PDU circuit breakers are receiving
power and that you have turned them on within a 10 second period of time.

Figure 58 Pilot bezel LEDs

Legend
2 If the Pilot has a DC power switch in the back, make sure that the DC
power switch is on.
Verify the Front Status LEDs
1 CU 0 LED
2 CU 1 LED
128

Advertisement

Table of Contents
loading

Table of Contents