Chapter 2 Set Up The Rack; About Component Inspection - Oracle Pillar Axiom 600 Hardware Installation Manual

Oracle pillar axiom 600 hardware installation guide
Table of Contents

Advertisement

Chapter 2 Set Up the Rack

C
2
HAPTER
Set Up the Rack

About Component Inspection

Each Pillar Axiom 600 system is built to a customer's specifications and shipped
in a single shipment. Check the components you received against the packing
slip (or bill of lading), which lists everything that was shipped. If any components
are missing, call 1-877-4PILLAR (474-5527) and report what was not included in
your shipment. Note how many pallets or containers you received, in case the
missing components are in a container that simply has not yet arrived.
Caution
Caution
Caution
After you remove the components from their packaging, inspect them for any
damage that may have occurred during shipping. If there is any damage:
1 Check your Terms of Sale to see who notifies the carrier.
2 Notify the carrier or the Pillar World Wide Customer Support Center, as
appropriate, within 72 hours.
About Component Inspection
A Brick weighs up to 65 pounds (29.5 kilograms). For safe
handling, use two people to lift it.
A Slammer weighs 94 pounds (42.6 kilograms). For safe
handling, use two people to lift it.
Before you handle a component, make sure that you have
taken electrostatic discharge (ESD) precautions:
● The minimum requirement is an anti-static wrist strap
connected to a hard ground. Pillar recommends that
you remove components from their packaging and
place them on an ESD-qualified table that is equipped
with ground points for wrist straps.
● Static charges can build up rapidly on rolling carts. If
you transport a hardware component by cart, ground
the cart with a drag chain on an ESD floor. If there is
no ESD cart available or ESD floor, ground yourself
before you touch a component that has been
transported on a cart.
26

Advertisement

Table of Contents
loading

Table of Contents