Chapter 2 Set Up the Rack
Note: In a system that is configured for the maximum number of Bricks, connect
the additional racks to the first rack before you install and cable the hardware
components.
Related concepts
About Component Placement for Two or Three Slammers and FC Bricks
•
Related references
Cabling Practices for the Pillar Axiom 600 System
•
Related tasks
Rename the Bricks
•
Pilot Rail Kit Parts
Verify that the rail kit contains all the parts listed in the table.
Before installing a pair of Pilot rack rails, make sure you have:
● One Pilot rail kit with rails and scopes pre-attached
● #20 Torx wrench
● Socket wrench
Pilot rails are 2U rack rail assemblies that contain the following parts:
Table 9 Pilot rail kit parts
Component
Pilot rail kits
1475-00036-xx
1450-00037-xx
Pilot rail scopes
2525-00093-xx
2525-00095-xx
About Component Placement
Drawing (not to scale)
Quantity
One left-right pair
One left-right pair
49