2.
007-4047-001
Chapter 2
Removing and Replacing System Components
This chapter contains step-by-step procedures on how to disassemble the SGI 1100 server
system for maintenance and troubleshooting.
Caution: The procedures contained in this chapter should be performed by a qualified
service technician. Do not perform the procedures described in the following sections
unless you are a qualified technician.
The following sections are covered:
•
"Tools and Supplies Needed" on page 20.
•
"ESD Precautions" on page 20
•
"Opening the Chassis" on page 21.
•
"Replacing the Link Bar and the Riser Card" on page 25
•
"Installing an Expansion Board" on page 30.
•
"Replacing the Chassis Fan Subsystem" on page 32.
•
"Replacing the Rear Chassis Blowers" on page 37.
•
"Replacing the Cable Modules" on page 40.
•
"Replacing Removable-Media Devices" on page 51.
•
"Replacing a Hard Drive" on page 63.
•
"Replacing the Power Supply Module" on page 71.
•
"Removing a Processor" on page 81.
•
"Removing a DIMM" on page 87.
•
"Replacing the CMOS Battery" on page 91.
•
"Replacing the System Board" on page 92.
19
Need help?
Do you have a question about the SGI 1100 and is the answer not in the manual?