Installing Memory Modules; Required Tools; Preliminary Steps - Fujitsu PRIMERGY TX140 S1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX140 S1:
Table of Contents

Advertisement

Main memory
10.2

Installing memory modules

Upgrade and Repair Units (URU)
Average task duration: 5 minutes

10.2.1 Required tools

Preliminary and concluding steps: tool-less
Installing memory modules: tool-less

10.2.2 Preliminary steps

Before installing a memory module, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Disable boot watchdog functionality as described in section
SVOM boot watchdog functionality" on page
Ê If applicable, open the rack door as described in section
door" on page
Ê Shut down the defective server as described in section
server" on page
Ê Remove the AC power cord from the cable tie and disconnect it from the
system as described in section
Ê When working on a rack-mounted server, extend it out of the rack as
described in section
If further required, remove the server from the rack as described in section
"Removing the server from the rack" on page
Ê Bring the server to its horizontal position.
Ê Open the side / top cover as described in section
on page 67
(rack server) or
server).
296
93.
61.
61.
"Disconnecting power cords" on page
"Extending the server out of the rack" on page
"Removing the side cover" on page 71
Upgrade and Maintenance Manual
"Disabling BitLocker
"Disabling
94.
"Opening the rack
"Shutting down the
66.
"Removing the top cover"
63.
65.
(tower
TX140 S1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents