Replacing The Ufm Board; Required Tools; Preliminary Steps - Fujitsu PRIMERGY TX140 S1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX140 S1:
Table of Contents

Advertisement

System board and components
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page

14.2.3 Replacing the UFM board

Field Replaceable Units (FRU)
Average hardware task duration: 10 minutes
Average software task duration: 5 minutes

14.2.3.1 Required tools

Preliminary and concluding steps:
– combination pliers and flat nose pliers
Replacing the UFM:
– Phillips PH1 / (+) No. 1 screw driver

14.2.3.2 Preliminary steps

Before replacing the UFM board, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Disable boot watchdog functionality as described in section
SVOM boot watchdog functionality" on page
Ê If applicable, open the rack door as described in section
door" on page
Ê Locate the desired server as described in section
server" on page
Ê Shut down the server as described in section
page
61.
430
93.
61.
54.
Upgrade and Maintenance Manual
116.
94.
"Shutting down the server" on
"Enabling
"Disabling BitLocker
"Disabling
"Opening the rack
"Locating the defective
TX140 S1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents