2-26 Compaq ProLiant ML750 Servers Setup and Installation Guide
Installing the Cable Management Arm
1. Slide the server into the rack.
2. Align the cable management arm.
NOTE: To align the cable management arm to the rack, place the cable management arm
one hole below the rack mounting bracket.
Figure 2-15. Aligning the cable management arm
3. Attach the cable management arm to the outside of the rack frame with
two M6 × 1.0-12L Phillips screws.
Figure 2-16. Attaching the cable management arm to the rack