Installing The Cable Management Arm - Compaq 226824-001 - ProLiant - ML750 Setup And Installation Manual

Compaq proliant ml750 server setup and installation guide
Hide thumbs Also See for 226824-001 - ProLiant - ML750:
Table of Contents

Advertisement

2-26 Compaq ProLiant ML750 Servers Setup and Installation Guide

Installing the Cable Management Arm

1. Slide the server into the rack.
2. Align the cable management arm.
NOTE: To align the cable management arm to the rack, place the cable management arm
one hole below the rack mounting bracket.
Figure 2-15. Aligning the cable management arm
3. Attach the cable management arm to the outside of the rack frame with
two M6 × 1.0-12L Phillips screws.
Figure 2-16. Attaching the cable management arm to the rack

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml750 series

Table of Contents