Compaq 226824-001 - ProLiant - ML750 Setup And Installation Manual page 55

Compaq proliant ml750 server setup and installation guide
Hide thumbs Also See for 226824-001 - ProLiant - ML750:
Table of Contents

Advertisement

2-24 Compaq ProLiant ML750 Servers Setup and Installation Guide
5. Carefully align the three screw holes on each side of the server and the
slide rail assembly. Attach the server to the slide rail assemblies with
six 8-32 Torx head screws.
Figure 2-13. Attaching the server
6. Remove the rack lift assists. Store the rack lift assists and screws for
future use if the server needs to be removed from the rack.
WARNING: To reduce the risk of personal injury, be careful when pressing the
component rail release latches and sliding the component into the rack. The
slide rails could pinch your fingertips.
IMPORTANT: The first time you slide the component into the rack, you may have to apply
some pressure. After the first time, the ball bearings in the slide will move easily.
7. Replace the top access panel.
8. Replace any hardware that was removed for installation (hard drives,
power supplies, and so on).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml750 series

Table of Contents