2-22 Compaq ProLiant ML750 Servers Setup and Installation Guide
IMPORTANT: To reduce the overall weight of the system, Compaq recommends that all
power supplies, hot-plug hard drives, top access panel, and both side access panels be
removed from the server before loading it onto the rails.
NOTE: For detailed information on removing the hot-plug hard drives and power supplies,
see Chapter 4, "Installing Hardware Options."
1. Extend the slides fully.
Figure 2-11. Extending the slides
2. Lift the server with the rack lift assists.