Commissioning
62
10
Commissioning
10.1
Post-mounting and post-connection check
Before commissioning the device:
‣
Make sure that the post-installation and post-connection checks have been performed
successfully.
• Checklist for "Post-installation" check→ 27
• Checklist for "Post-connection" check→ 35
10.2
Identifying the device in the PROFINET network
A device can be quickly identified within a plant using the PROFINET flash function. If the
PROFINET flash function is activated in the automation system, the LED indicating the
network status flashes and the red backlight of the onsite display is switched on.
10.3
Startup parameterization
By activating the startup parameterization function (NSU: Normal Startup Unit), the
configuration of the most important measuring device parameters is taken from the
automation system.
Configurations taken from the automation system .
10.4
Connecting via FieldCare
• For connecting FieldCare
• For connecting via FieldCare → 47
• For user interface of FieldCare → 48
10.5
Setting the operating language
Factory setting: English or ordered local language
The operating language can be set in FieldCare, DeviceCare or via the Web server:
Operation → Display language
10.6
Configuring the measuring instrument
The Setup menu with its submenus contains all the parameters needed for standard
operation.
Setup
Name of station
‣
System units
‣
Communication
Proline Promass A 100 PROFINET
→ 63
→ 63
→ 65
Endress+Hauser