Commissioning; Notes On Commissioning - YASKAWA iC9200 Series Operating Manual

Hide thumbs Also See for iC9200 Series:
Table of Contents

Advertisement

iC9200 Series
4.5

Commissioning

4.5.1

Notes on commissioning

HB700 | CPU | PMC921xEx | en | 24-04
2.
On the start bar, click on a project template that corresponds to your firmware
version, such as Yaskawa CPU iC921xM-x
�� The project template for a blank CPU iC921xM-x opens.
3.
Open 'File �� Save Project As', assign a meaningful name to your project and close
the dialog with [Save].
WARNING
Prevent automatic start-up
Take appropriate measures to ensure that automatic start-up of your plant/
machine is prevented.
NOTICE
Acclimatization before start-up
Make sure that commissioning only takes place after the CPU and the associ-
ated modules have acclimatized!
NOTICE
Damage due to improper handling
Handle the CPU and components with care!
When installing the CPU and components, ensure that mechanical
damage is avoided!
NOTICE
Startup of the CPU not guaranteed
To ensure that the CPU starts up properly, the supply voltage must not be
switched on until at least 30 seconds after the device LEDs go out.
Deployment CPU iC921xM-EC
Commissioning > Notes on commissioning
89

Advertisement

Table of Contents
loading

Table of Contents