NOTICE
Damage due to improper handling
Handle the CPU and components with care!
When installing the CPU and components, ensure that mechanical
damage is avoided!
NOTICE
Startup of the CPU not guaranteed
To ensure that the CPU starts up properly, the supply voltage must not be
switched on until at least 30 seconds after the device LEDs go out.
NOTICE
Online verification required during commissioning phase
In the commissioning phase, the values for program runtime and cycle time
determined offline in the planning phase must be verified online.
Always take the associated checklist into account when commissioning.
⮫ 'Checklist commissioning, parametrization and validation'...page 217
Operation and programming may only be carried out by qualified per-
sonnel!
Operation and programming may only be carried out via iCube Engineer!
Ensure that a PC system with running iCube Engineer is always available
during the entire time of operation!
Otherwise, no later modifications can be done.
Ensure legally compliant documentation and archiving of your engi-
neering project!
Deployment CPU iC921xM-FSoE
Commissioning > Notes on commissioning