Periodic Maintenance; Periodic Maintenance; Replacement Parts - YASKAWA P1000 Technical Manual

Ac drive
Hide thumbs Also See for P1000:
Table of Contents

Advertisement

7.3

Periodic Maintenance

The drive has Maintenance Monitors that keep track of component wear. This feature provides advance maintenance warning
and eliminates the need to shut down the entire system for unexpected problems. The drive allows the user to check predicted
maintenance periods for the components listed below.
• Cooling Fan, Circulation Fan, Control Board Cooling Fan
• Electrolytic Capacitors
• Inrush Prevention Circuit
• IGBTs
For replacement parts, contact the distributor where the drive was purchased or contact Yaskawa directly.
u

Replacement Parts

Table 7.3
contains the estimated performance life of components that require replacement during the life of the drive. Only
use Yaskawa replacement parts for the appropriate drive model and revision.
Component
Cooling Fan, Circulation Fan
Electrolytic Capacitors
<1> Electrolytic capacitors cannot be replaced on some lower capacity models. Complete drive replacement may be required for these models.
NOTICE: Estimated performance life based on specific usage conditions. These conditions are provided for the purpose of replacing parts
to maintain performance. Some parts may require more frequent replacement due to poor environments or rigorous use.
Usage conditions for estimated performance life:
Ambient temperature: Yearly average of 40 °C (IP20/IP00 enclosure)
Yearly average of 30 °C (side-by-side mounting/NEMA 1, UL type 1 enclosure/finless drive or external heatsink installation)
n
Performance Life Monitors Maintenance Monitors
The drive calculates the maintenance period for components that may require replacement during the life of the drive. A
percentage of the maintenance period is displayed on the HOA keypad by viewing the appropriate monitor parameter.
When the maintenance period reaches 100%, there is increased risk that the drive may malfunction. Yaskawa recommends
checking the maintenance period regularly to ensure maximum performance life.
Refer to Recommended Periodic Inspection on page 231
Parameter
Component
Cooling Fan
U4-03
Circulation Fan
Control Board Cooling
U4-04
Fan
U4-05
DC Bus Capacitors
Inrush (pre-charge)
U4-06
Relay
YASKAWA SIEP YAIP1B 01B YASKAWA AC Drive – P1000 Bypass Technical Manual
Table 7.3 Estimated Performance Life
Table 7.4 Performance Life Monitors Used for Component Replacement
Displays the accumulated operation time of the fan, from 0 to 99999 hours. This value is automatically reset
to 0 once it reaches 99999.
Displays the accumulated fan operation time as a percentage of the specified maintenance period.
Displays the accumulated time the capacitors are used as a percentage of the specified maintenance period.
Displays the number of times the drive is powered up as a percentage of the performance life of the inrush
circuit.
Estimated Performance Life
for more details.
Contents

7.3 Periodic Maintenance

10 years
<1>
10 years
7
233

Advertisement

Table of Contents
loading

Table of Contents