Figure 120: Reinstalling The Nut And Washer On The Grounding Post - Allied Telesis AT-SB*908 GEN2 Installation Manual

Advanced layer 3 plus modular switch, alliedware plus v5.4.8-0, virtual chassis stacking, chassis, ethernet line card, fan module, ac/dc power supply
Table of Contents

Advertisement

Chapter 9: Replacing Modules
Figure 120. Reinstalling the Nut and Washer on the Grounding Post
Note
If you did not perform step 3 to loosen the retaining screw on the
power supply, perform the step before continuing.
11. Lift the locking handle and slide the power supply from the chassis.
Refer to Figure 121 on page 189.
Warning
The power supply is heavy. Use both hands to hold the module as
you remove it from the chassis.
188

Advertisement

Table of Contents
loading

Table of Contents