Figure 20: Improper Installation Of Power Supply; Figure 21: Tightening The Captive Screws On The Power Supply - Allied Telesis AlliedWare Plus x530DP Series Installation Manual

Stackable gigabit layer 3 ethernet switches
Hide thumbs Also See for AlliedWare Plus x530DP Series:
Table of Contents

Advertisement

Chapter 3: Installing the Power Supplies
66
Figure 20. Improper Installation of Power Supply
6. Secure the power supply to the switch by tightening the two captive
screws with a cross-head screwdriver. Refer to Figure 21.
Figure 21. Tightening the Captive Screws on the Power Supply
7. If you installed the PWR150, PWR150R, PWR250, PWR250-80, or
PWR800 Power Supply, install the power cord retaining clip on the AC
plug. Press the sides of the clip inward and insert the two ends into the
holes on the AC socket. Refer to Figure 22 on page 67.

Advertisement

Table of Contents
loading

Table of Contents