Figure 39: Installing The Grounding Lug And Wire - Allied Telesis AT-SB*908 GEN2 Installation Manual

Advanced layer 3 plus modular switch, alliedware plus v5.4.8-0, virtual chassis stacking, chassis, ethernet line card, fan module, ac/dc power supply
Table of Contents

Advertisement

Chapter 4: Installing the Chassis
86
Figure 39. Installing the Grounding Lug and Wire
5. Connect the other end of the grounding wire to the building protective
earth.
6. Go to "Installing AT-SBxPWRSYS2 AC Power Supplies" on page 87 or
"Installing AT-SBxPWRSYS1-80 DC Power Supplies" on page 91.

Advertisement

Table of Contents
loading

Table of Contents