Doosan DX60R Shop Manual page 723

Table of Contents

Advertisement

8.
Install two plugs (GIA).
NOTE:
Tightening Torque 350 - 470 Nm (36 - 48 kg•m)
(260 - 347 ft lb)
9.
Coat parallel pins with grease and insert into cylinder.
10. Coat rear side of control plate with grease and align plate
with key groove in cover and install onto block.
Main Pump
Figure 81
Figure 82
Figure 83
SP001488
Page 43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

50001

Table of Contents