Doosan DX60R Shop Manual page 721

Table of Contents

Advertisement

Assembling Control Spring
1.
Coat control spring bores with grease before assembling.
2.
Install two springs (both internal and external).
3.
Install spring seat and insert control spring.
4.
Install cover with Allen head bolts.
NOTE:
Tightening Torque 55 - 69 Nm (5.6 - 7.0 kg•m)
40.5 - 50.5 ft lb)
Main Pump
Figure 73
Figure 74
Figure 75
Figure 76
SP001488
Page 41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

50001

Table of Contents