Doosan DX60R Shop Manual page 133

Table of Contents

Advertisement

17. Remove six bolts (M10) and washer, a nut (M10), two nuts
(M16) and washers (Figure 11).
18. Install sling on four places above cabin with proper device
for lifting (Figure 12).
NOTE:
The weight of cabin is about 480 kg (1,058.2 lb).
19. Lift cabin approximately 25 - 50 mm (1" - 2") above deck.
Check
that
all
disconnected and all other items unbolted.
20. Continue lifting with the assist crane to remove the cabin.
Lower the cabin to a prepared safe blocking support.
Cabin
electrical
connections
Figure 10
Figure 11
have
been
Figure 12
D
FG011065
FG013819
FG013824
SP001623
Page 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

50001

Table of Contents