Verification; Introduction; Equipment Required - Chroma 63200A Series Operation & Programming Manual

High power dc electronic loads
Table of Contents

Advertisement

6.

Verification

6.1

Introduction

This chapter contains test procedures for checking the operation and specification of
Chroma 63200A Series. The tests are performed using the 63200A Series models and
some required equipment. The required test equipment is listed in Table 6-1. Please refer
the Performance Tests section for equipment connecting and test procedure. The user can
use verification tables included at Verification Test Records section for checking the
specification. The performance tests confirm Chroma 63200A Series meet the published
specifications. For the detailed information of operation and programming please refer to the
Chapter 3 and Chapter 4.
If any of the 63200A Series models requires service, refer to the list of Chroma Sales and
Support Offices at the web site http://www.chromaate.com/english/contact/default.asp.
6.2

Equipment Required

The following table lists the equipment or its equivalent required for verification.
Equipment
Voltmeter
Current Transducer 2000A
DC Source
Mainframe
Connection
Connect the Load, DC Source, DMM and Current Shunt as shown in Figure 6-1. Use DMM (I)
to measure the voltage that passes through the shunt resistor measurement port, and get
the Load current.
Table 6-1 Equipment Suggested for Verification
Characteristics
5 1/2 digits or more
10V/1200A, 600V/8A
Figure 6-1
Recommended Model
Agilent 34401A, Agilent 3458A
DC-CT(ITZ-2000-SBPR)
CHROMA 62120-10-1200, Chroma
62012P-600-8
Chroma 63200A
Verification
6-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

63200a-150-60063200a-150-400

Table of Contents