Weber Geset 141 Original User Manual page 27

Table of Contents

Advertisement

Chapter 5 Transport
Instruction
Use the following procedure to transport the labeling system to its site of use .
Step
1
2
3
4
5
6
7
Version: 30.01.15
Procedure
Transport the labeling system to its site of use (within 3 m). The labeling
system is precisely positioned during installation by a Technician from the
Bluhm Weber Group.
Risk of injury! The straps are secured tightly and can fly back when they are
cut and cause injury.
Remove any film and straps (if available).
Remove, if available, all transport securing devices from the rubber feet.
Lift the labeling system with a suitable material handling equipment in shown
way from the pallet.
Open the carton or the box and remove the filling and additional material.
Lift the system with at least two persons at cabinet and at base plate from
packaging and place it on a stable support.
Before startup, remove all transport securing devices (identified red tie
wrap).
Page 27 of 97
40020664 Geset 141
Fig. 5-2: Lift labeling station from pallet
GB

Advertisement

Table of Contents
loading

Table of Contents