DIAGNOSTICS
10DEC05
2
If the measurements are not correct, do the checkout for the
DG4825-1
Page
146 of 180
Important
To do
Step
•
install the INTERLOCK KEY, or
•
close the FRONT DOOR
3
Check the voltages at the test points:
4
If the voltage is not correct, do the checkout for the
Important
To check the +10 V DC, do the adjustment for the GALVO BOARD A4.
5
Check the voltages at the test points:
6
If any of the voltages do not match the table, install a new GALVO BOARD A4.
3, you must:
MULTIMETER
Ground
Positive
TP1
TP16
MULTIMETER
Negative
Positive
TP1
TP5
TP1
TP6
TP1
TP13
TP1
TP15
Voltage
–24 ± 0.5 V DC
INTERLOCK SWITCH
Voltage
+15 ± 0.25 V DC
− 15 ± 0.25 V DC
+10 ± 0.1 V DC
+5 ± 0.1 V DC
Checkout Procedures
POWER SUPPLY
PS1.
S8.