Replacement Of The Monitor Transportation Lock (Bt09 Only) - GE Voluson E8 Service Manual

Hide thumbs Also See for Voluson E8:
Table of Contents

Advertisement

GE H
RAFT
EALTHCARE
D
KTD102576, R
IRECTION
Section 8-16

Replacement of the Monitor Transportation Lock (BT09 only)

NOTE:
The Monitor Transportation Lock is only used if the "outdated" monitor arm (KTZ154817) is mounted on
the Voluson system.
8-16-1
Manpower
One person, 2 minutes
8-16-2
Tools
Phillips screwdriver PH1 and PH2
8-16-3
Monitor Transportation Lock - Removal Procedure
1.) Unscrew 1 screw, then remove the Monitor Transportation Lock.
8-16-4
Monitor Transportation Lock - Installation Procedure
1.) Attach the new Monitor Transportation Lock and fasten it with 1 screw.
8-24
Section 8-16 - Replacement of the Monitor Transportation Lock (BT09 only)
7
DRAFT (A
EVISION
Figure 8-26 remove 1 screw
23, 2012)
UGUST
V
E8 / V
OLUSON
OLUSON
S
M
ERVICE
ANUAL
Monitor
Transportation Lock
1 screw
E6

Advertisement

Table of Contents
loading

Table of Contents