ECC800 Data Center Controller
User Manual
----End
Follow-up Procedure
After the commissioning is complete, disconnect the cable from the PC and restore the cable
connection as it was before the commissioning.
5.7.3 Adding a Camera on the VCN
Prerequisites
The network communication between the VCN and the camera is normal.
Procedure
Step 1 Install the Client/Server (C/S) client.
Issue 07 (2020-03-16)
Figure 5-21 Setting secondary stream 1 parameters
The version number is subject to the Quick Start delivered with the VCN. The description and link in
this document are for reference only.
Copyright © Huawei Technologies Co., Ltd.
5 Power-On Commissioning
140