Installation And Initial Operation - Carl Valentin DYNACODE II IP53 Operating Manual

Ingress protection version
Hide thumbs Also See for DYNACODE II IP53:
Table of Contents

Advertisement

Dynacode II IP
Unpack/pack the direct
print module
Scope of delivery
03.21
7

Installation and Initial Operation

CAUTION!
Danger of injury by imprudent handling when lifting or
placing the printing system. Risk of crushing by
unexpected linear movement of the printing carriage.
Do not underestimate the weight of the printing
system (9 ... 16 kg).
Do not lift the printing system at the hood.
Protect the printing system against uncontrolled
movement.
Check the direct print module for transport damages.
Remove the foam transportation safeguards near the printhead.
Check delivery for completeness.
Print mechanics.
Control unit with cable.
Cleaning cassette.
Connecting cable.
Mini controller.
Manometer.
Pneumatic tube.
Push-on connector.
I/O accessories (mating connector for I/Os).
Protective cover for control unit IP 65.
1 transfer ribbon roll.
Empty core, mounted on transfer ribbon rewinder.
Cleaning foil for printhead.
Documentation.
CD with printer drivers.
NOTICE!
Retain the original packaging for subsequent transport.
Operating Manual
Installation and Initial Operation
33

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DYNACODE II IP53 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Dynacode ii ip107Dynacode ii ip128

Table of Contents