Figure 78: Affixing The Warning Labels; Figure 79: Tightening The Two Screws On The Fixed Brackets - Allied Telesis x530DP Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.5.1-2.1
Table of Contents

Advertisement

Appendix B: Installing the Switch in the RKMT-SL01 Sliding Rack
198
Figure 78. Affixing the Warning Labels
3. Slide the switch fully into the rack.
4. Tighten the two screws on the fixed brackets to secure the switch to
the equipment rack. Refer to Figure 79.
Figure 79. Tightening the Two Screws on the Fixed Brackets
Warning
Always be sure to secure the switch to the outer rail (via the
adjustment bracket). If the switch is not secured properly, there is a
risk of it falling out during an earthquake.
Warning
Do not pull the switch out past the front rack posts.
E68
E69

Advertisement

Table of Contents
loading

This manual is also suitable for:

X530dp-28ghxmX530dp-52ghxm

Table of Contents