Installing The Switch - Allied Telesis GS950PS V2 Series Quick Installation Manual

Gigabit websmart ethernet switches
Table of Contents

Advertisement

The site should allow for adequate air flow around the unit and
through the cooling vents on the side panels.
Do not place objects on top of the switch.
The site should not expose the switch to moisture or water.
The site should be a dust-free environment.
The site should use dedicated power circuits or power
conditioners to supply reliable electrical power to the network
devices.
Do not install the switch in a wiring or utility box without adequate
airflow and cooling. The switch might overheat and shutdown.
Warning: Switches should not be stacked on a table or
desktop. They could present a physical safety hazard if
you need to move or replace switches.
Direction of Ventilation in the Switches
The GS950/18PS V2, GS950/28PS V2, and GS950/52PS V2
Switches have internal ventilation fans. Airflow is from left to right,
when facing the front of the switch.
Note: The GS950/10PS V2 Switch does not have ventilation fans.
The site must provide sufficient airflow to prevent overheating of the
device.

Installing the Switch

Installing the Switch on a Desk or Table
To install the switch on a desk or table, perform the following
procedure:
1. Place the switch upside down on the table.
2. Affix the bumper feet to the four corners on the bottom panel of
the switch.
8
GS950PS V2 Series Quick Installation Guide
E91

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs950/10ps v2Gs950/18ps v2Gs950/28ps v2Gs950/52ps v2

Table of Contents