Unpacking The Switch - Allied Telesis AT-FS980M/28DP Installation Manual

Fast ethernet managed switches
Table of Contents

Advertisement

Chapter 2: Installing the Switch

Unpacking the Switch

AT-FS980M/9
AT-FS980M/9PS
AT-FS980M/18
Brackets
Eight
bracket
screws
Four rack
screws
Four rubber
feet
48
To unpack the FS980M series switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the hardware components are included in your switch
package. Table 12 shows a list of the hardware components.
Table 12. Components in the Bracket Kit
AT-FS980M/18PS
AT-FS980M/28
AT-FS980M/52
AT-FS980M/28PS
AT-FS980M/52PS
M4 x 6.8mm flat-head
screw
AT-FS980M/
28DP

Advertisement

Table of Contents
loading

Table of Contents