Installing The Switch On A Concrete Wall - Allied Telesis GS950 PS V2 Series Installation Manual

Gigabit ethernet poe+ switches
Hide thumbs Also See for GS950 PS V2 Series:
Table of Contents

Advertisement

Chapter 5: Installing the Switch on a Wall

Installing the Switch on a Concrete Wall

68
Allied Telesis recommends a minimum of two people for this procedure.
Warning
The device should be installed on a wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is not properly fastened to the wall. 
E105
Warning
The device is heavy. Use both hands to lift it. You might injure
yourself or damage the device if you drop it.  E94
To install the switch on a concrete wall, perform the following procedure:
1. Place the switch on a table.
2. Install the two brackets to the sides of the unit with the eight screws
that come with the switch. Refer to Figure 30 on page 66.
3. After attaching the brackets to the side of the switch, have another
person hold the switch on the concrete wall at the selected location for
the switch while you use a pencil or pen to mark the wall with the
locations of the four screw holes in the two brackets. Refer to Figure
32 on page 69.
Please follow these guidelines as you position the switch on the wall:
Position the switch so that the front panel is facing up or down.
Refer to Figure 24 on page 56. Do not install the switch with the
front panel facing right or left.
Leave sufficient space from other devices or walls so that you can
access the front and back panels. Refer to "Recommended
Minimum Reserved Wall Area" on page 59.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs950/10ps v2Gs950/18ps v2Gs950/28ps v2Gs950/52ps v2

Table of Contents