Running A Remote Port Performance Test; Running A Usb A Port Performance Test - Christie HS Series Service Manual

Hide thumbs Also See for HS Series:
Table of Contents

Advertisement

Running a remote port performance test

ID
Part name
1
Test equipment
2
Test signal
3
Inspection item
4
Inspection distance
5
Criteria
To perform the remote port performance test, complete the following steps.
1. Connect the projector and remote controller using an audio cable.
2. On the IR remote, press Menu.
The image of on-screen display menu is projected.

Running a USB A port performance test

ID
Part name
1
Test equipment
2
Test signal
3
Inspection item
4
Inspection distance
5
Criteria
To perform the USB A port performance test, complete the following steps.
1. Connect a U disk to the projector over the USB A port.
2. Switch the signal source to Card reader.
The data of U disk is projected.
HS Series D13 Service Manual
020-000892-03 Rev. 1 (12-2019)
Description
Remote controller
None
Wired remote port performance test
1.8 to 2.2 m
To confirm that it can power on/off the projector, on the remote controller,
press ON.
Description
U disk
64 Gray RGBW
USB A port performance test
1.8 to 2.2 m
No abnormal color performance, line distortion, or noise exist on the screen
Service setups
34

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D13wu-hsD13hd-hs

Table of Contents