Running A Remote Port Performance Test; Running A Usb A Port Performance Test - Christie HS 2K Series Service Manual

Hide thumbs Also See for HS 2K Series:
Table of Contents

Advertisement

ID
Part name
3
Inspection item
4
Inspection distance
5
Criteria
To perform the 3D SYNC out port performance test, complete the following steps.
1. Connect the projector and RF emitter using a BNC cable.
2. Wear the 3D RF glasses.
3. Switch the signal source to 3D SYNC.
The 3D image is projected.

Running a remote port performance test

To verify the remote port functionality, conduct a performance test on the remote port.
ID
Part name
1
Test equipment
2
Test signal
3
Inspection item
4
Inspection distance
5
Criteria
To perform the remote port performance test, complete the following steps.
1. Connect the projector and remote controller using an audio cable.
2. On the IR remote, press Menu.
The image of on-screen display menu is projected.

Running a USB A port performance test

To verify the USB type A port functionality, conduct a performance test on the USB type A port.
ID
Part name
1
Test equipment
2
Test signal
3
Inspection item
4
Inspection distance
5
Criteria
HS Series 2K Service Manual—D13HD2-HS, D13WU2-HS, D16HD-HS, D16WU-HS, D20HD-HS, D20WU-HS
020-001468-02 Rev. 1 (01-2020)
Copyright ©2020 Christie Digital Systems USA Inc. All rights reserved.
Description
3D SYNC port performance test
1.8 to 2.2 m
No abnormal color performance, line distortion, or noise exist on the screen
Description
Remote controller
None
Wired remote port performance test
1.8 to 2.2 m
To confirm that it can power on/off the projector, on the remote controller,
press ON.
Description
U disk
64 Gray RGBW
USB A port performance test
1.8 to 2.2 m
No abnormal color performance, line distortion, or noise exist on the screen
Service setups
34

Advertisement

Table of Contents
loading

This manual is also suitable for:

D13hd2-hsD13wu2-hsD16hd-hsD16wu-hsD20hd-hsD20wu-hs

Table of Contents