Board Transport Unit; Replacing The Transport Belt - JUKI FX-1 Maintenance Manual

High-speed modular mounter
Table of Contents

Advertisement

FX-1/FX-1R Maintenance Manual
  DANGER
[5]

BOARD TRANSPORT UNIT

5-1. Replacing the Transport Belt

(1) Loosen the transport belt tension adjustment pulley.
(IN/OUT)
Figure 5-1-1
(2) Replace the belt with the one shown in Table 5-1-1.
(3) To provide appropriate belt tension, measure the length of the belt with no tension exerted, and
adjust the position of the transport pulley along the slot so that the belt length increases by
0.5%.
To do this, use a pencil or similar to make two marks on the belt, at distance of 200 mm.
Move the transport pulley to exert tension so that the distance increases to 201 mm.
Readjust the transport belt tension one week after it has been adjusted.
To prevent any trouble caused by accidental machine start, always
shut-down the power before starting the maintenance and
 
adjustment work.
Table 5-1-1
Location
CENTER BUFFER
CONVEYOR BELT C
IN/OUT BUFFER
CONVEYOR BELT S
(CENTER)
Figure 5-1-2
Part name
Part No.
L167E521000
L171E121000
5-1
Rev. 2.00

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fx-1r

Table of Contents