Scope of delivery and requirements
1.4 Starting up the control
1.4
Starting up the control
Control startup
Procedure:
1. Switch the control on. The following display then appears during startup:
2. Press the <SELECT> key within three seconds.
16
Commissioning Manual, 10/2015, 6FC5397-3DP40-5BA3
CNC commissioning