Siemens SINUMERIK 828D Commissioning Manual page 174

Hide thumbs Also See for SINUMERIK 828D:
Table of Contents

Advertisement

Commissioning the drive
5.6 Configuring data sets
7. Press "Next step >" to check in the summary the changes to be performed.
8. Press "Finish >" to accept the changes.
9. Confirm with "OK" to save the data in non-volatile memory.
The saving/writing of the parameters can take several minutes.
160
Commissioning Manual, 10/2015, 6FC5397-3DP40-5BA3
CNC commissioning

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents