Preparing For Commissioning; Collecting Motor Data; Factory Setting Of The Converter Control - Siemens SINAMICS G120 Operating Instructions Manual

Low voltage converters, chassis and wall/panel mounted devices with cu230p-2 control units
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Commissioning

5.2 Preparing for commissioning

5.2
Preparing for commissioning
5.2.1

Collecting motor data

Before starting commissioning, you must know the following data:
● Which motor is connected to the inverter?
Note down the Article No. of the motor and the motor's nameplate data.
If available, note down the motor code on the motor's nameplate.
● In which region of the world is the motor to be used?
- Europe IEC: 50 Hz [kW]
- North America NEMA: 60 Hz [hp] or 60 Hz [kW]
● How is the motor connected?
Pay attention to the connection of the motor (star connection [Y] or delta connection [Δ]).
Note the appropriate motor data for connecting.
5.2.2

Factory setting of the converter control

Motor
In the factory, the inverter is set for an induction motor matching the rated power of the
Power Module.
Inverter control
You can find the factory setting of the inverter control in Chapter: Factory setting of the
interfaces (Page 86)
116
Converter with CU230P-2 Control Units
Operating Instructions, 04/2015, FW V4.7 SP3, A5E34257946B AB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120cSinamics g120p

Table of Contents