Commissioning

5.2 Preparing for commissioning

5.2
Preparing for commissioning
Before starting commissioning, you must know the following data:
● Which motor is connected to the inverter?
Note down the Article No. of the motor and the motor's nameplate data.
If available, note down the motor code on the motor's nameplate.
● In which region of the world is the motor to be used?
- Europe IEC: 50 Hz [kW]
- North America NEMA: 60 Hz [hp] or 60 Hz [kW]
● How is the motor connected?
Pay attention to the connection of the motor (star connection [Y] or delta connection [Δ]).
Note the appropriate motor data for connecting.
82
Operating Instructions, 07/2016, FW V4.7 SP6, A5E34262100B AD
Converter with control units CU240D-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu240d-2

Table of Contents