Siemens SINAMICS G120 Operating Instructions Manual page 217

Low voltage converters, chassis and wall/panel mounted devices with cu230p-2 control units
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Table 6- 30
Parameter
p1120
p1121
p1130
p1131
p1134
p1135
p1136
p1137
You can find more information in function diagram 3070 and in the parameter list of the List
Manual.
Converter with CU230P-2 Control Units
Operating Instructions, 04/2015, FW V4.7 SP3, A5E34257946B AB
Additional parameters to set the extended ramp-function generator
Description
Ramp-function generator, ramp-up time (factory setting depends on the Power Mod-
ule)
Duration of acceleration (in seconds) from zero speed to maximum speed P1082
Ramp-function generator, ramp-down time (factory setting depends on the Power
Module)
Braking time in seconds from the maximum speed down to standstill
Ramp-function generator initial rounding time (Factory setting depends on the Power
Module)
Initial rounding for extended ramp-function generator. The value applies for ramp up
and ramp down.
Ramp-function generator final rounding time (Factory setting depends on the Power
Module)
Final rounding for extended ramp-function generator. The value applies for ramp up
and ramp down.
Ramp-function rounding type (factory setting: 0)
0: Continuous smoothing
1: Discontinuous smoothing
OFF3 ramp-down time (factory setting depends on the Power Module)
OFF3 initial rounding time (Factory setting depends on the Power Module)
Initial rounding time for OFF3 for an extended ramp-function generator.
OFF3 final rounding time (factory setting: 0 s)
Final rounding for OFF3 for the extended ramp-function generator.
Advanced commissioning
6.4 Setpoint calculation
217

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120cSinamics g120p

Table of Contents