Commissioning

5.3 Preparing for commissioning

5.3
Preparing for commissioning
Prerequisites: before you start
Before you start parameterization, you should clarify the following issues about
commissioning your application.
Are the factory settings sufficient for your application?
Check which factory settings can be used and which need to be changed (see Section
'Commissioning with factory settings'). When doing so, you may find that you only need to
change just a few parameters.
Which motor are you using? [P0300]
● A synchronous or induction motor?
The SINAMICS Inverters are preset in the factory for applications using 4-pole three-phase
induction motors that correspond to the performance data of the frequency inverter.
Motor data / data on the motor rating plate
If you use the STARTER software and a SIEMENS motor, you only have to specify the
Order No of the motor. In all other cases, you must read-off the data from the motor rating
plate and enter the data into the appropriate parameters.
Image 5-2
64
Rating plate data as parameters
Operating Instructions, 07/2016, FW V3.63, A5E36768472B AB
SINAMICS G110D