Installing
4.4 Installing Power Modules
Table 4- 8
Frame size
FSA
FSB
FSC
FSD, FSE
FSF
GX
Can be mounted without any lateral clearance for ambient temperatures of up to 40 °C in opera-
1)
tion. For tolerance reasons, we recommend a lateral clearance of approx. 1 mm.
Mounting and operation are permissible without lateral clearance. For tolerance reasons we rec-
2)
ommend a lateral clearance of approx. 1 mm.
Table 4- 9
Frame size
FSA
FSB
FSC
FSD
FSE
With shield connection kit: FSA: + 80 mm; FSB: + 78 mm; FSC: + 77 mm
1)
Total depth of the inverter: See below.
2)
Table 4- 10
Frame size
FSA, FSB
FSC
FSD
FSE
Mounting and operation are permissible without lateral clearance. For tolerance reasons we rec-
1)
ommend a lateral clearance of approx. 1 mm.
Maintain sufficient clearance for the Control Unit and the operator panel.
2)
62
Mounting hardware and clearances to other devices for PM240
Hardware
M4 screws
M4 screws
M5 screws
M6 screws
M8 screws
M8 screws
Dimensions for PM240-2
Dimensions (mm)
a
(width)
(height)
73
196
100
292
140
355
200
420
275
500
Mounting hardware and clearances to other devices for PM240-2
Hardware
M4 screws
M5 screws
M5 screws
M6 screws
Tightening torque (Nm)
2.5
2.5
3
6
13
13
b
c
(depth)
1)
2)
165
165
165
235
235
Tightening torque
(Nm)
Top
2.5
80
3.0
80
3.0
300
6.0
300
Operating Instructions, 04/2015, FW V4.7 SP3, A5E34257946B AB
Clearances (mm)
Top
Bottom
100
100
100
100
80
100
300
300
350
350
250
150
Drilling dimensions
d
e
62.3
186
80
281
120
343
170
400
240
475
Clearances (mm)
Bottom
Lateral Front
100
0
1)
100
0
1)
350
0
1)
350
0
1)
Converter with CU230P-2 Control Units
Lateral
30
1)
40
1)
50
1)
0
2)
0
2)
50
f
6
6
6
10
10
0
2)
0
2)
100
100

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120cSinamics g120p

Table of Contents