Power Cabling; External Frame Ground Point Rear View - Nokia 7360 Intelligent Services Access Manager FX Series Hardware Installation Manual

Ansi
Hide thumbs Also See for 7360 Intelligent Services Access Manager FX Series:
Table of Contents

Advertisement

7360 ISAM FX-12 shelf cabling
Figure 80
4
5

10.5 Power cabling

This section describes the 7360 ISAM FX-12 general information, power distribution
unit location, and the external power cabling procedure to connect the power cables.
174

External frame ground point rear view

No. 2 AWG lug and 2 12-24 screws
Frame ground point
Rack frame ground locations rear view
Perform power and ground tests as per local practices.
STOP. This procedure is complete.
3HH-12893-AAAA-TCZZA
ANSI Hardware Installation Manual
(provided with the rack)
DRAFT
Frame ground point
Frame ground point
(may be located on
the opposite side
on some racks)
25880
Issue: 09

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7360 isam fx-16

Table of Contents