ANSI Hardware Installation Manual
4 Installing racks
4.1 Overview
This chapter provides the procedures to install 7360 ISAM FX and 7360 ISAM WM
ANSI racks using the adapter plate assembly, floor mounting hardware, and rack
base guards for both seismic and non-seismic qualified installations.
4.2 Unpacking and inspection
In general, the rack is shipped in horizontal position. It includes the shelves, the
baffles, and drip trays.
Plug-in cards, fans, and cables are shipped separately from the rack.
4.2.1
The shelf can be shipped either mounted in the rack for predefined configurations
(see the 7360 ISAM FX Product Information Guide for possible configurations), or as
an individual item for customer expansion beyond initial configuration.
4.2.2
When installing shelf units in existing rack configurations, the cables, mounting
brackets, and heat/airflow fiber management baffles are shipped as separate kits or
units.
Issue: 09
4.1 Overview
4.2 Unpacking and inspection
4.3 Installing a rack
Always transport plug-in cards in their original
Note —
package.Never transport them while they are plugged into the
shelf.
Shelf units
Separate kits and parts
3HH-12893-AAAA-TCZZA
DRAFT
Installing racks
61