Parts List; Recommended Tools; Procedures - Nokia 7360 Intelligent Services Access Manager FX Series Hardware Installation Manual

Ansi
Hide thumbs Also See for 7360 Intelligent Services Access Manager FX Series:
Table of Contents

Advertisement

ANSI Hardware Installation Manual
The following applies for multiple rack configurations.

3.3 Parts list

For racks and hardware mounting parts can be ordered from Nokia. See the
7360 ISAM FX Product Information Guide for ordering information.

3.4 Recommended tools

The following tools are recommended:

3.5 Procedures

Use the following procedures to prepare the ANSI installation site.
Procedure 4
1
2
3
Issue: 09
Racks can be added from either left to right, or right to left. The order is not
important.
Cable areas on the left and the right of each rack allow you to route rack cables
up to rack overhead guides.
common shears
level, 3 ft (1 m)
chalk line and chalk
felt marking pen
measuring tape
anchoring tool
To mark the rack positions
Verify the layout of floors, ceiling and walls is as shown in the applicable drawings and
specifications provided by the site survey team.
Verify that the area dimensions and the location of reference points correspond to the floor
plan.
Use a level to verify that the floor is level.
Warning — Risk of equipment damage when the floor is not level.
Do not try to mount a rack on a floor that is not level.
3HH-12893-AAAA-TCZZA
DRAFT
Floor preparation
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7360 isam fx-16

Table of Contents